Home >

Contract For Feasibility Study Of Construction Projects

2011/1/6 11:31:00 42

Construction Feasibility Study Contract

Consignor: the first party, the first party, the first, the second and the third.


Address: it is a very good one.


Postal Code: the first, the second and the third.


Tel: I am, I am, I am, I am.


The legal representative is:


Position: the first is the first, the second is the second.


Contractor: it is: contractors, contractors, and customers.


Address: it is a very good one.


Postal Code: the first, the second and the third.


Tel: I am, I am, I am, I am.


The legal representative is:


Position: the first is the first, the second is the second.


After negotiation by both parties, the Contractor shall entrust the contractor with the feasibility study of the project.


The first party shall provide the contractor with all the data and data relating to the research project within the days from the date of signing the contract, and shall be responsible for the accuracy of the data.


1. provide data and information as follows:


2. during the term of the contract, the client shall carry out the information, such as discussion, inquiry, negotiation, investigation and investigation related to the project, which shall be provided to the contractor in time, and if necessary, the contractor may participate in the feasibility study of the project.


The second Contractor shall submit the feasibility report of the contract project to the client before the date of the year, and shall be responsible for it.

The content of the feasibility report should include:


1. economic evaluation indicators:


(1) the rate of return on investment is: internal and external returns:


(2) the period of investment recovery is: the first, the second and the third.


2. analysis of loan repayment capacity:


3. analysis of foreign exchange repayments capacity:


4. profit and loss balance, sensitivity analysis and risk assessment:


5. conclusion: it should be submitted to the client for the feasibility report.


Client is in

contract

During the period, major changes have been made to the project of the construction of the project. There will be significant changes in the original data and data, which may lead the contractor to revise the feasibility report or even rework. It is necessary for the two parties to negotiate the contract to amend the contract, or to add an appendix to the task change or to make another contract.


Third article

Cost

Payment terms


1. the feasibility study cost of the project is RMB yuan, China, Hong Kong, and Macao.

On the date when the contract comes into effect, the client shall pay the Contractor a deposit of 20% of the above amount.

The remaining amount is paid in full at the expiration of the contract.


2. when the client suspends the contract, he has no right to ask the contractor to refund the deposit.


3. when the Contractor fails to fulfill his obligations and obligations under this contract, he shall double the deposit.


Fourth article

Default

fine


1. if the Contractor fails to submit a feasibility study report on the date stipulated in the contract, each delay period shall be deducted from the amount of% of the cost due to the contractor, as a penalty for breach of contract.


2. there are errors in the feasibility study report provided by the contractor, and those errors are caused by the contractor, and the 10% to 30% of the cost should be deducted, depending on the severity of the error.


3. major amendments to the feasibility study caused by the client's responsibility, or rework for rework, shall be increased separately, and the amount shall be agreed upon by both parties.


4. when the client has paid more than the contract date, he shall pay the Contractor a penalty for overdue breach of contract, calculated at% per cent of the contract cost per day.


The fifth contract is effective from the date of signing.

If there are any unsettled matters in the contract, the two parties shall consult together to make amendments or supplementary provisions.

The amendment or supplementary provisions shall have the same effect as this contract.


The sixth contract is made in two originals, each holding one copy.

Copies of the contract are issued in duplicate.


Client: Mr. Gai Zhang,


Person in charge: the year of the year, the month, the day and the day.


Contractor: Mr. Gai Zhang,


Person in charge: the year of the year, the month, the day and the day.

  • Related reading

Integrated Kitchen Production Contract

Contract template
|
2011/1/6 11:29:00
57

Repair And Repair Contract

Contract template
|
2011/1/6 11:26:00
35

Criminal Principal Agent Contract

Contract template
|
2011/1/5 13:52:00
84

Exclusive Agency Contract Agreement

Contract template
|
2011/1/5 13:50:00
103

产品销售代理协议

Contract template
|
2011/1/5 13:48:00
47
Read the next article

System Engineering Contract

This contract shall come into force after signature and seal of the representatives of both parties. The original contract is made in duplicate. Each party holds one copy and has the same legal effect. Statement: this contract is invalid after photocopying or alteration.